Excavation Started
|
Footing Installation
|
Footing Drain Tile & Gravel
|
Starting the Foundation
|
Block Going Up
|
Waterproofing Walls
|
Floor Truss Installation
|
Walls Going Up
|
Trusses Going Up
|
Adding Sheathing to Trusses
|
Back Yard View From Patio Door
|
Up Go The Shingles
|
Porch & Windows
|
Drainage Gravel in Basement
|
1 inch of Insulation over Gravel
|
Concrete Pour in Basement
|
Up Goes The Brick
|
Concrete Driveway and a Dash of Green
|
Front Entrance with Color for Parade Day
|
Siding is done on back
|
Deck, Patio & Retaining Wall
|
Basement - Foam rim joist (R-19 or better) & kneewall top plates
|
Foam kneewall top plates
|
Basement stud walls foamed with open cell foam
|
Example of Closed cell foam top & open cell foam bottom
|
Looking West to livingroom
|
Looking East to kitchen
|
Looking North to entrance
|
Looking down to bedroom hall
|
Office floor
|
Entrance - Polished floor
|
Bedroom - Polished floor
|
Office - Closet doors
|
Office - Cabinets & Countertop
|
Master bathroom tile
|
Master bathroom tile seat
|
Livingroom - Dining Room - Kitchen
|
Fireplace from front entrance
|
FIREPLACE XTRODINAIR
Model 36-Elite
|
A Little Color
|
The Chef's Kitchen
|
Plenty Of Room
|
Add Some Natural Light
|
A Little Extra Storage
|